Network Connection Application Form

Browser Compatibilty
 
IMPORTANT! This form is only compatible with Internet Explorer 6 and higher.
Contact Person Responsible for Work
 
IMPORTANT! 1. Five (5) working days must be allowed to process this application.
  2. To be completed by the person accepting responsibility for any costs incurred by this application.  
  3. Where necessary, this installation must comply with AS/NZS 3000, the current Electricity Regulations, the Network Tasman Distribution Code and must be certified and inspected prior to livening or relivening.
  4. One this NCA is approved by Network Tasman it is then your own responsibility to arrange a time and date with your nominated Accredited Contractor for Connection, to visit site and complete the works.
  5. Easement Route: All Necessary Electrical easements must be registered prior to NCA approval.
  6. This application may incur costs from any of the following: Network Tasman; The nominated Accredited Contractor for Connection; The Energy Retailer; An auditor; Others. It is your responsibility to determine these costs from the respective companies prior to actioning this application.
  7. The electrician should not install the mains cable until the connection point and phasing have been approved by Network Tasman.
Load Default Data
                                               This section allows you to make a template of default data that you use on most NCA's. Just fill in the form below with the data you will consistently reuse and click 'Save Defaults'. In the future when you are filling in an NCA form just type your Email address in the field to the left and click 'Load Defaults'. Your data will automatically be loaded into the form.
Email Address          
Type
New Totally new connection
Temp Builder's Metered Supply HP Meterbox with 3 pin plug on post that is metered, inspected and certified
From Temp Builders Metered Supply to Permanent Supply To change from a temporary builders supply to a permanent supply
Overhead to Underground Conversion To remove the overhead servicemain and install underground
Upgrade  Upgrade fuse size
Downgrade Downgrade fuse size
Phase Change To change the number of phases to an installation
Decommission Total removal of fusing and service cable
Meter Relocation Relocation of meterboard requiring resealing eg. internal to external
Reconnection 6 Months + Reconnection of ICP that has been disconnected for greater than 6 Months
Installation Address
 
Unit Used if there is more than one dwelling on a property
Street Number Street number or emergency services number
Street  
Suburb  
Town  
Property Name Farm name etc
Lot Either a Street number, a CT number or a Lot and Dp will be required as an address to process this application
DP
CT Number
Other Useful Information/Site Notes Any site details that might be useful
Applicants Details for Installation
 
Name Name of account holder
Mailing Unit  
Mailing Street Number  
Mailing Street Address Mailing address or PO Box number
Mailing Suburb  
Mailing Town  
Post Code OR Postal code of applicant
Day Phone Phone number is required by retailer to confirm applicant is happy to be the account holder
Afterhours Phone
Electrical Contractor for Prescribed Work
 
Name This is who the approved copy of the application form is posted to, generally your electrician, notifying of application approval or non approval
Address
Town
Phone Number  
Email
Contact Person Responsible for Work
 
Name
Email Address Notification of approval is sent to this address, generally the electrician.
Mains Size & Capacity Requested
 
Installation Type  or Other      Example - kiln, play-centre or sawmill
Proposed Service Main Size (mm2)   This advises the inspectors what the cable size is so they can come with the right parts to do the job
Conductor Type (Copper / Aluminium) Cu       Al
Estimated Maximum Demand Amps
Capacity Requested (Amps)
 

Group:

Motors & Other Loads
 
Detail other connected loads with individual installed capacities greater than 6kW. (e.g. Instant Hot water, Welders, Spa-pools, Pottery Kilns, Irrigation)
Motors with a Full Load Rating greater than 1.5kW. Please detail both motor size and power factor
Motors must comply with the Committee Report on motor starting currents for A C.Motors - 1982. 
System Disturbances & Waveform Distortion
 
The application is approved subject to the applicant not causing any disturbance or distortion outside the limits specified in the NTL  Distribution Code DC 2.3.3. Group 2 installations shall not have a power factor less than 0.95. Refer DC 2.4.3.
The Power Factor of this installation is
Other Information
Energy Retailer Preferred Installing Contractor for Connection
Existing ICP Number (if known)